Trade Insights Today - Investing and Stock News
  • Investing
  • Latest News
  • Editor’s Pick
  • Economy
  • Investing
  • Latest News
  • Editor’s Pick
  • Economy
No Result
View All Result
Trade Insights Today - Investing and Stock News
No Result
View All Result
Home Economy

NASA Terminates $2 Billion Satellite Project

by
March 5, 2024
in Economy
0
NASA Terminates $2 Billion Satellite Project
0
SHARES
7
VIEWS
Share on FacebookShare on Twitter

NASA Terminates $2 Billion Satellite Project

Quick Look

NASA terminates the $2 billion OSAM-1 project amid setbacks and delays. The project aimed to extend satellite lifespans using a robotic arm for refuelling. Industry shifts and a lack of committed partners contribute to the project’s end. Maxar Technologies faces criticism for delays and increased costs. NASA seeks to mitigate impacts on staff at the Goddard Space Flight Center.

Launched with high hopes in 2015, NASA’s On-orbit Servicing, Assembly, and Manufacturing 1 (OSAM-1) project aimed to revolutionize space technology. Its objective was to refuel ageing satellites, thereby extending their operational life. This innovative project promised to save costs and reduce space debris by keeping satellites in use for longer periods. However, despite its potential, NASA announced on Friday that it would discontinue the effort. An independent review highlighted “continued technical, cost, and schedule challenges,” leading to the project’s unfortunate demise.

SPIDER’s Leap: Redefining Space Tech

The OSAM-1 project represented a bold step into the future. At the heart of this mission was the Space Infrastructure Dexterous Robot (SPIDER), designed to perform engineering feats. SPIDER was tasked with opening fuel hatches and unscrewing fuel caps in the vacuum of space, representing a significant advancement in robotic technology. Its primary mission was to refuel the Landsat 7 satellite, a task never intended when the satellite launched in 1999. However, as the space industry evolved toward satellites designed for refuelling, the need for such a project began to diminish. Coupled with the lack of a committed partnership, the project’s relevance faced significant challenges.

OSAM-1’s Cost Surge to $2.05B: Delays and Doubts

Financial and contractor issues further complicated the OSAM-1 project. Initially estimated at $753 million, the project’s cost escalated to $2.05 billion by 2022. Maxar Technologies, responsible for delivering the spacecraft and robotic arm, faced criticism for delays and rising costs. The contractor’s “poor performance” strained its relationship with NASA and led to considerable setbacks for the project. With the spacecraft delivered two years late and continuous delays for SPIDER, the mission’s feasibility began to dwindle. Maxar’s admission of no longer profiting from the contract work signalled deep-seated problems within the project’s execution.

In response to these challenges, NASA has shifted its focus toward mitigating the impact of OSAM-1’s cancellation on its dedicated staff at the Goddard Space Flight Center. The termination of this ambitious project marks a poignant moment in space exploration, reflecting the complexities and evolving needs of the industry. Although the dream of refueling satellites in orbit remains unfulfilled, the lessons learned from the OSAM-1 mission will undoubtedly shape future endeavors to extend human capability in space.

The post NASA Terminates $2 Billion Satellite Project appeared first on FinanceBrokerage.

Previous Post

STEPN Green Satoshi Token (GST-SOL) Skyrockets By 565%

Next Post

Bounty Temple (TYT) Unleashed: $960K ICO & P2E Revolution

Next Post
Bounty Temple (TYT) Unleashed: $960K ICO & P2E Revolution

Bounty Temple (TYT) Unleashed: $960K ICO & P2E Revolution

    Become a VIP member by signing up for our newsletter. Enjoy exclusive content, early access to sales, and special offers just for you! As a VIP, you'll receive personalized updates, loyalty rewards, and invitations to private events. Elevate your experience and join our exclusive community today!


    By opting in you agree to receive emails from us and our affiliates. Your information is secure and your privacy is protected.

    • Trending
    • Comments
    • Latest
    Buy Bitcoin Under $100K Before The Next Bull Run

    Buy Bitcoin Under $100K Before The Next Bull Run

    April 22, 2025
    KIATOKEN ICO (KIA): Transforming Philanthropy with Crypto

    KIATOKEN ICO (KIA): Transforming Philanthropy with Crypto

    April 3, 2024
    Consumers are tired of price increases. Big brands are paying attention.

    Consumers are tired of price increases. Big brands are paying attention.

    February 23, 2024
    Trump dismisses Musk’s political ambitions as ‘ridiculous’ in sharp rebuke

    Trump dismisses Musk’s political ambitions as ‘ridiculous’ in sharp rebuke

    0
    Rite Aid is closing more than 150 stores as part of its bankruptcy process

    Rite Aid is closing more than 150 stores as part of its bankruptcy process

    0
    Here are the nine Republicans running for House speaker

    Here are the nine Republicans running for House speaker

    0
    Trump dismisses Musk’s political ambitions as ‘ridiculous’ in sharp rebuke

    Trump dismisses Musk’s political ambitions as ‘ridiculous’ in sharp rebuke

    July 7, 2025
    Iran still wants a nuclear weapon despite ‘serious damage’ from US, Israeli strikes: expert warns

    Iran still wants a nuclear weapon despite ‘serious damage’ from US, Israeli strikes: expert warns

    July 6, 2025
    Democrats project doom and gloom, not celebration, with July 4 messages

    Democrats project doom and gloom, not celebration, with July 4 messages

    July 5, 2025
    • About us
    • Contacts
    • Privacy Policy
    • Terms & Conditions
    • About us
    • Contacts
    • Privacy Policy
    • Terms & Conditions

    Copyright © 2024 Tradeinsightstoday.com

    No Result
    View All Result
    • Investing
    • Latest News
    • Editor’s Pick
    • Economy

    Copyright © 2024 Tradeinsightstoday.com